Civils and stations

31.10.14

Impressive new photos of London Bridge works

Network Rail has just released pictures and video of the installation of the huge new signal gantry at London Bridge that its engineers installed last weekend.

More than 100 staff took advantage of the extra hour as the clocks went back last weekend to install the structure, spanning 10 of the 11 tracks on the approach to London Bridge.

Huge signal gantry installed on the approach to London Bridge, Oct 2014

The station rebuild team are gearing up for a 16-day closure over Christmas and into the new year for the signalling overhaul.

The current edition of RTM, arriving with subscribers from today, includes an update on the London Bridge works and an interview with Laurence Whitbourn, Network Rail’s project director. He told us: “We’ve met all of the deadlines so far, and they remain challenging moving forwards – as you can imagine for such a complex project.”

A video of the works is below:

 

The below image shows some of the demolition works. The photo was taken about six weeks ago.

Demo-3 (13 Sept 0100) edit 3

London Bridge works timeline

Current stage (stage 1B) (Sept to Dec 2014)

  • Platforms K and L (new platforms 10 and 11) constructed, brought into use 5 Jan 2015

Stage Central Core and Stage 2 (Jan 15 to Dec 15)

  • Platforms 8 and 9 taken out of passenger use 19 Dec 2014
  • Platforms 4, 5 and 6 taken out of passenger use 9 Jan 2015
  • Platforms G, H and J (new platforms 7, 8 and 9) constructed
  • Completion of new Viaduct from Borough High Street to London Bridge station
  • Charing Cross trains will travel non-stop through platforms 4 and 6 from Jan to May 2015
  • Charing Cross trains will travel non-stop through platforms 5 and 6 from May to Dec 2015
  • Thameslink services will cease through London Bridge on 19 Dec 2014, not stopping until 29 May 2018.

Stage 2A (Jan 2016 to Sep 2016)

  • Construct platforms E and F (new platforms 5 and 6).
  • Charing Cross trains will run non-stop through platforms 7, 8 and 9 and over new viaduct.
  • At the end of this stage the Southern part of the new Concourse opens

Stage 3 (Sep 2016 to Apr 2017)

  • Construct platforms A and B (new platforms 1 and 2)
  • Platforms 1, 2 and 3 are taken out of passenger use on 26 August 2016
  • Charing Cross services resume stopping using platforms 7, 8 and 9
  • Cannon Street services will run non-stop through new platforms 5 and 6
  • Bermondsey Dive Under completes in Dec 2016 to allow for greater throughput through London Bridge from 2018

Stage 3A (Apr to Dec 2017)

  • Construct platforms C and D (new platforms 3 and 4)
  • Cannon Street services will run non-stop through new platforms 1 and 2
  • New platform 6 is brought into passenger use in Aug 17, for Charing Cross services

Stage 4 (Jan to May 18)

  • Finishing works to London Bridge Station, Northern part of the Concourse opens 2 Jan 2018
  • Thameslink services will run non-stop through new platforms 4 and 5.
  • Cannon Street services stopping at new Platforms 1, 2 and 3 from 2 Jan 2018

Post stage 4 (May 2018)

  • Thameslink stopping services resume 29 May 2018
  • Cannon Street services through platforms 1, 2 and 3
  • Thameslink services through platforms 4 and 5
  • Charing Cross services through platforms 7, 8 and 9
  • Terminating services to platforms 10 to 15

Comments

There are no comments. Why not be the first?

Add your comment

related

rail technology magazine tv

more videos >

latest rail news

Major station improvements and electric vehicle charging hubs

09/09/2020Major station improvements and electric vehicle charging hubs

Following the announcement of Govia Thameslink Railway’s (GTR) programme to develop numerous stations, today (9 Sept) on World Electric Veh... more >
Contract awarded by Network Rail to strengthen bridges

09/09/2020Contract awarded by Network Rail to strengthen bridges

Three contracts have been awarded by Network Rail to carry out strengthening work to three railway bridges across the Wessex route in the South o... more >
New electric train fleet revealed for Birmingham’s Cross-City Line

09/09/2020New electric train fleet revealed for Birmingham’s Cross-City Line

The electric train fleet set to transform travel on Birmingham’s Cross-City Line has been revealed to rail passengers in the West Midlands.... more >

last word

Encouraging youngsters to be safe on the railway

Encouraging youngsters to be safe on the railway

This summer, Arriva Group's CrossCountry and the Scout Association joined to launch a new partnership to promote rail safety among young people. Chris Leech MBE, business community manager at the... more > more last word articles >

'the sleepers' daily blog

On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

29/06/2020On the right track, Sulzer is awarded RISAS accreditation for Nottingham Service Centre

Following an independent audit, Sulzer’s Nottingham Service Centre has been accepted as part of the rail industry supplier approval scheme (RISAS). The accreditation reinforces the high-quality standards that are maintained by Sulzer’s network of independent repair facilities across the UK and further afield in its global network. ... more >
read more blog posts from 'the sleeper' >

comment

The challenge of completing Crossrail

05/07/2019The challenge of completing Crossrail

With a new plan now in place to deliver Crossrail, Hedley Ayres, National Audit Office manager, major projects and programmes, takes a look at ho... more >
Preparing the industry to deliver trains for the future

04/07/2019Preparing the industry to deliver trains for the future

The move to decarbonise the rail network involves shifting to cleaner modes of traction by 2050. David Clarke, technical director at the Railway ... more >
Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

02/07/2019Sunshine future beckons for South Wales Railways, says 10:10 Climate Action’s Leo Murray

Smart electrification is the way to boost clean energy resources, argues Leo Murray, director at 10:10 Climate Action. Contractors are clear... more >
Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

02/07/2019Ambition doesn’t have to be expensive, says Midland Connect's Maria Machancoses

The TCR Midlands conference is only days away and tickets are going fast for the sector event of the year at the Vox Conference Centre in Birming... more >

rail industry focus

View all News

interviews

Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

24/06/2019Andrew Haines, CE of Network Rail, tells BBC News his organisation could issue future rail franchises

Andrew Haines, the Chief Executive of Network Rail, has told the Today programme on Radio 4's BBC’s flagship news programme that he wo... more >