Christchurch Earthquake Repair Process

Ever since the earthquakes wrecked Christchurch city and encircling regions, those who live there have faced the inevitable process associated with restoring their lives together with their city. First on the priority list of points to have completed is the repair of peoples private places of residence, though it is likely to take some time before all the repairs have been completely achieved. There has been a lot of negative publicity with how the procedure is presently getting handled with stories of not much communication with homeowners as well as poor quality with the work which is actually achieved. It truly is lucky there’s an alternate procedure that makes it possible for home-owners to enjoy more charge of the actual timings and quality of the fixes on their own houses. The operation is often called opting out.

Image

Damage cause by the earthquake in Christchurch.

Step one to complete in the opting out approach is to get your home examined through the Earthquake Commission, referred to as the EQC. The EQC is a government section that was set up to give protection to homeowners who secured themselves from damage from earthquakes together with other natural disasters (originally war damage was incorporated but this has been taken out). This task will be conducted whether or not you will be opting out.

As soon as your house has been evaluated and the cost of the fix has been determined to be over $15k (this use to be $10k but has recently been elevated) but less than $100k, EQC immediately gives the repair to Fletcher Building for project management (Fletchers Construction acquired the government tendered contract for the work). Fletchers isn’t going to complete the job themselves but act as the project managers and will employ technicians to the job. As you can appreciate, that with the enormous quantity of jobs these evaluations have produced, it’s hard for Fletchers to regulate the standard of the trades-people on each and every job. If you’re looking to ensure your property earthquake repairs are finished to the best of standards then EQC opt out might be the preferred method for you.

Opting out is the procedure through which you choose your own project manager/contractor, and thus acquiring better control over the calibre of the project and also the speed which the work is carried out. Contractors designated to work with Fletchers aren’t allowed to work with other EQC jobs, put simply, they’re not able to work on opt out jobs. So if you are utilising an opt out contractor, you can be assured they’re entirely focused on your job.