This is the html version of the file http://www.renewables2004.de/ppt/Presentation1-SessionIVA(9-10.30h)-Ma%20Shenghong.ppt.
Google automatically generates html versions of documents as we crawl the web.
The Brightness and Township Electrification Program in China  
 

The Brightness and Township Electrification Program in China 

Prof. Ma Shenghong, Vice Director, Bejing Jikedian Renewable Energy Development Center, China

 

 
The Brightness and Township Electrification Program in China  

Prof. Ma Shenghong

Beijing Jikedian Renewable Energy Development Center 

June. 2004 

 

Background  

 

Renewable Energy Resources 

 

 

Efforts from 1970--2000 

 

Brightness Program 

 

 
Pilot Projects of the Brightness Program 

Pilot Projects

 
 
 
 
 
 
 

Installations of the Pilot Projects

 

   Supported by SDPC, MOST an SP, electrification project of Ali Prefecture, Tibet was implemented in 2001. 688 kW PV were installed. The total investment is about RMB 70 million.

 

Program in Ali Prefecture of Tibet

 

Song Dian Sao Xiang Program (1) 

 
 

Song Dian Dao Xiang (2) 

 

Map of the Main Project Provinces

 

A 300 kW PV Hybrid System in Gansu Province

 

A 145 kWp PV Plant in Xinjiang

 

A 46 kWp PV System in Tibet

 

Experiences 

 

Challenges  

 

Outlook   

 

Significances 

 
 

It is really good to have a electrical light !

 

   Thanks! 

We would express our sincere appreciation to those nations and international organizations that supported us in the field. China welcomes all of you to join us in the next large scale programs! 

 
 

The Brightness and Township Electrification Program in China 

Prof. Ma Shenghong, Vice Director, Bejing Jikedian Renewable Energy Development Center, China